Rate this post

2023 Latest C_TS422_1909 DUMPS Q&As with Explanations Verified & Correct Answers

C_TS422_1909 dumps Exam Material with 91 Questions

SAP C_TS422_1909 Certification Exam Topics:

Topic Areas Topic Details, Courses, Books
Capacity Planning in SAP S/4HANA 8% – 12%

Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

Demand Management in SAP S/4HANA < 8%

Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning.

Introduction to SAP S/4HANA Production Planning < 8%

Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

Introduction to SAP S/4HANA Supply Chain Planning < 8%

Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

Advanced Planning in SAP S/4HANA > 12%

Outline the basics and master data of advanced planning,  explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

Production Orders in SAP S/4HANA > 12%

Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation.

 

Q14. Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Please choose the correct answer.
Response:

 
 
 
 

Q15. A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.
Response:

 
 
 
 

Q16. At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be generated?
Please choose the correct answer.
Response:

 
 
 
 

Q17. What is SAP’s strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing?
Please choose the correct answer.
Response:

 
 
 
 

Q18. Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are 2 correct answers to this question.

 
 
 
 

Q19. You use planning strategy Finite Scheduling – with Reverse and want to allow scheduling in the past. How can you achieve this?

 
 
 
 

Q20. If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?

 
 
 
 

Q21. Which of the following is a valid sequence of the main activities in product on order processing?

 
 
 
 

Q22. What is the difference between co-products and by-products?

 
 
 
 

Q23. For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

 
 
 
 
 

Q24. What are prerequisites for using batch derivation?
There are 2 correct answers to this question.
Response:

 
 
 
 

Q25. MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

 
 
 
 

Q26. Where do you maintain the duration of a product on operation?

 
 
 
 

Q27. Which data object can be updated with the scheduling results of a routing?
Please choose the correct answer.
Response:

 
 
 
 

Q28. What new technology is used in SAP S/4HANA Embedded Analytics?
Please choose the correct answer.
Response:

 
 
 
 

Share Latest C_TS422_1909 DUMP Questions and Answers: https://www.pdf4test.com/C_TS422_1909-dump-torrent.html

Related Links: scalar.usc.edu www.shippingexplorer.net hashnode.com www.slideshare.net github.com scalar.usc.edu

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below